- China Mining are expanding their operations in Australia.they require offices to be set up in Sydney (Head Office). adelaide (Office A, Perth (office B) which will be directly connected to the head office.
You are requested to create a network design which will cater to the requirements listed below. A proof of concept POC) exercise is required to demonstrate the functionality of your design. This POC will be conducted using Cisco Packet Transfer and the setup saved and submitted for design approval prior to rolling out the solution. The network diagram must take into account factors such as classless addressing, site rout summarization and network convergence where possible.
Part 1
For each location a site LAN must be setup.
Part 2:
In addition to lan connectivity each office must be able to communicate