Contents
OUTLINE OF DOHA INTERNATIONAL AIRPORT
HISTORY
Environment Consideration in Development
PREVIOUS LAND USAGE AND NEED FOR DEVELOPMENT
Reason behind construction
Reasons for Development
References
Description
This report is based on the following requirement –
You are required to prepare a report on a major development that has either been constructed during the past 10 years or is currently proposed for an area with which you are familiar. Examples of developments which you could select include a new road, building, airport, dam, weir, subdivision, manufacturing factory, mine, power lines, tourist enterprise (e.g. bungee jump site, sky rail), agricultural enterprise (e.g. piggery, farmland clearing, processing plant), port or bridge (there may be many others more appropriate to your area).
The assignment should cover three areas:
1. Provide an outline of the major development proposal you have selected for study. Include specific details of the development such as the size, nature, construction and operational requirements, and location (a map may be appropriate).
2. Outline the general history of land use for the surrounding area of the development (e.g. locality/shire/region) that you have selected. Include details of the nature and extent of both urban and rural land use history since settlement (or a suitably long time frame) and comment on the relationships between the physical and social resources of the area and the development that has occurred.
3. Describe the previous land use of the specific site and immediate surrounding areas, and the appropriateness of the development given the history of the land development in the area. Ensure that you also provide the reasons (e.g. physical, social, economic) why this development has been proposed or constructed in this area.